GUATEMALA
SAN ANTONIO
July, 2018: Partial replacement of a damaged wind turbine at the San Antonio Wind Park in Guatemala. As road conditions had changed, our blade-lifter was required to transport the three V112 blades of 55m in length to site, apart from the nacelle, hub and drive train, which too were transported without incidents.
OTHER PROJECTS